<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, Fugro Alluvial, Walney Extension, Geotechnical Site Investigation (Cable Route)</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_b436e74c-b43d-4185-b6bb-965be421a280</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Fugro Alluvial Offshore Limited (FAOL) was requested by Dong Energy Power (UK) Limited to perform a geotechnical investigation at the site to provide soils information to assist in the design and installation of a cable route. The work was performed from the Fugro Commander from 25 October to 16 November 2012 in accordance with instructions received from Dong Energy Power (UK) Limited.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:10:53</dc:date>
</oai_dc:dc>
