<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2007, Centrica Renewable Energy Ltd, Inner Dowsing, Lynn and Lincs Offshore Wind Farms, Drill Arising Disposal Monitoring</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_b94ce7e2-3323-4f24-8043-1eabb101e025</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Centrica Renewable Energy Ltd (CREL) is constructing an offshore wind farm and associated infrastructure at
Lynn and Inner Dowsing approximately 5km from land off the coast of Skegness, Lincolnshire. As a number of
proposed monopile locations required additional drilling during installation due to a hard underlying chalk formation,
Centrica commissioned a field environmental survey to monitor the dispersion of drill arisings both in a near-field
and far-field environment. The resulting study, carried out by RPS Energy, was based upon a suspended sediment
survey, with fifteen sediment traps deployed at 100m, 1km and 5km distance from the drilled monopole locations.
The survey was carried out in two phases, relating to the suspended materials recovered after 8 days, and the
drilling of one monopile foundation (LN02), and a longer 30 day deployment following the combined effects of
partially drilling 5 foundations. Survey operations included some preliminary seabed sampling and photography at
and around some of the monopile locations prior to and immediately after drilling.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2007</dc:date>
</oai_dc:dc>
