<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, LUC, ARUP, Neart na Gaoithe Offshore Wind Farm, Onshore Geotechnical and Geo-environmental Desk Study</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_bb3cc21a-6c53-4ed2-9a4e-d89a79989ccc</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connection infrastructure associated with the Neart na Gaoithe Offshore Wind Farm located within East Lothian. Land Use Consultants Limited (LUC) with associated sub-consultant Arup Partners Ltd (ARUP) were commissioned by Mainstream Renewable Power Limited, on behalf of Neart na Gaoithe Offshore Wind Limited, to undertake a Geotechnical and Geo-environmental Desk Study as part of the Environmental Statement. The desk study of the proposed route of the buried cable did not comprise opening up or testing of the ground, but a site walkover was carried out.

The objectives of this desk study are to identify any potential geotechnical and geo-environmental risks / constraints associated with the development of the site, and provide recommendations for appropriate site investigations.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20250304T14:22:47</dc:date>
</oai_dc:dc>
