<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2007, CMACS, Burbo Bank, Year 1 Benthic Grab Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_bf9f2190-475b-402d-8e78-c651c2dbf81b</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Burbo Offshore Wind Farm is a twenty-five turbine, 90MW development located in Liverpool Bay approximately 6km from the coastlines of Wirral, Crosby and Liverpool. A licence was issued to the wind farm developer, SeaScape Energy Ltd, which allows them to construct and operate the wind farm. The benthic (seabed) monitoring programme consists of annual surveys by grab sampling and beam trawling. It is being undertaken by Centre for Marine and Coastal Studies Ltd (CMACS) on behalf of SeaScape. The programme commenced with baseline (pre-construction) surveys in autumn 2005. This report presents the results of benthic grab surveys carried out in autumn 2007, after completion of installation of all major components of the wind farm, and compares the results with baseline and during construction survey data.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:32:04</dc:date>
</oai_dc:dc>
