<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2017, EGS, Lincs Offshore Wind Farm, Lincs LS23 and LS65 Clearance Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_c9ad677d-cedf-4c99-9811-d8679b571749</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">EGS International Ltd (EGSi), were contracted by Centrica Renewable Energy Limited (CREL) to undertake a side scan sonar (SSS) and multibeam (MBES) clearance survey centred on the no cable zone (400m x 400m) adjacent to WTGs LS23 &amp;amp; LS65 at the Lincs Offshore Wind Farm. The surveys were required to support the safe emplacement of a jack-up vessel adjacent to the WTG for maintenance purposes. This series details the operations and results of the survey around all turbines.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:48:28</dc:date>
</oai_dc:dc>
