<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2009, Centre for Marine and Coastal Studies Ltd., (CMACS), Burbo Bank Offshore Wind Farm, Post-Construction Year 2 Environmental Monitoring</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_d09e2663-2ca4-4885-9935-fe7f2132688a</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Centre for Marine and Coastal Studies Ltd (CMACS) was appointed by SeaScape Energy Ltd in April 2005 to develop and undertake pre and during construction environmental monitoring to meet the requirements of the Food and Environment Protection Act (FEPA) licence issued to the wind farm developer. The report in this series includes a wide range of surveys (among seabed morphology, cable burial, ornithology and benthic organisms) undertaken in the second year of wind farm operation between August 2008 and July 2009.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201211</dc:date>
</oai_dc:dc>
