<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2017, Bibby Hydromap, Walney, Asset Integrity Survey 3</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_d14d3308-fd70-46be-a067-cc4360598571</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Bibby HydroMap were commissioned in May 2017 by DONG Energy to carry out surveys for the crossing and proximity agreement on the WOW0102 wind farm. The surveys were completed under Bibby HydroMap&#x2019;s Terms and Conditions. The surveys were carried out between 11/05/17 and 19/05/17.
The main objectives were as follows:
-	Minimum 100% coverage
-	Sounding density better than 40 hits/m2
-	Freespan detection &amp;gt;0.2m
-	Detect any debris of size larger than 0.5m in any dimension (width, length or height) on the seabed
Data acquisition was undertaken from Bibby HydroMap&#x2019;s own vessel MV Lia
This dataset comprises information describing the bathymetry in the survey areas.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:09:58</dc:date>
</oai_dc:dc>
