<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2006, Centre for Marine and Coastal Studies (CMACS), Burbo Bank Offshore Wind Farm, Pre-Construction Photographic Cable Route Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_d58f6b41-6bb5-417c-9360-43d03c807989</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">A photographic survey was undertaken specifically to meet the requirements of English Nature to monitor areas within the Mersey Estuary and North Wirral Foreshore pSPA following cable plowing works</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">201211</dc:date>
</oai_dc:dc>
