<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2016, Bibby HydroMap, Burbo Bank, Asset Integrity Management Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_e025f982-eeaa-44de-a13a-384443d3e7b7</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Bibby HydroMap were commissioned in July 2016 by DONG Energy to carry out a survey after a rock dumping campaign at West of Duddon Sands Windfarm (WDS01), and an Asset Integration Management (AIM) survey at Burbo Bank Windfarm (BBW01). The surveys was carried out between 30th July 2016 and 31st August 2016. A bathymetric AIM survey on all WTG positions, array cables and both SSS and MBES on the export cables, along with two further cross lines.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:32:01</dc:date>
</oai_dc:dc>
