<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, DONG Energy, Westermost Rough, Additional Electromagnetic Field Evidence</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_e39f0020-a9bd-4cb0-9670-b1c26eb6ae18</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">The document within this series provides additional evidence in relation to the burial depth of the array and export cables at the Westermost Rough Offshore Wind Farm, and the potential effects of a reduction in burial from the electromagnetic fields that are produced from them during operation. The report is a desk-based assessment the aim of which is to summarise any further reports or investigations on the potential effects on electro sensitive species from electromagnetic fields originating from the submarine power cables and to assess whether further biological monitoring and mitigation will be required to investigate the effect from the Westermost Rough Offshore Wind Farm project.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T14:14:10</dc:date>
</oai_dc:dc>
