<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012 Neart na Gaoithe Offshore Wind Farm Onshore Geotechnical and Geo-environmental Desk Study</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_ebf463d0-ade7-4a61-965c-fd20b8906905</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Mainstream Renewable Power Limited is currently developing the Neart na Gaoithe Offshore Wind Farm, located 15.5 km off Fife Ness on the east coast of Scotland. An Environmental Statement had to be prepared in support of the application for planning permission to construct and operate grid connection infrastructure associated with the Neart na Gaoithe Offshore Wind Farm located within East Lothian. Land Use Consultants Limited (LUC) with associated sub-consultant Ove Arup &amp; Partners Ltd (ARUP) were commissioned by Mainstream Renewable Power Limited, on behalf of Neart na Gaoithe Offshore Wind Limited, to undertake a Geotechnical and Geo-environmental Desk Study as part of the Environmental Statement. The desk study of the proposed route of the buried cable did not comprise opening up or testing of the ground, but a site walkover was carried out.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">2012</dc:date>
</oai_dc:dc>
