<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2004, Titan Environmental Surveys, Humber Gateway, Baseline Geophysical Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_ee1f0f95-23ad-4e6c-9643-5909a599e150</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">This project examines the geophysical survey of the proposed Humber Gateway offshore wind farm location as part of the baseline characterisation of the site. MV Domoch and the MV Titan Explorer were used to conduct the survey work between 27th September and 26th November 2004. The survey area encompassed the turbine box and two potential cable routes. Principle aims were to provide detailed information on the bathymetry, seabed morphology, potential obstructions and shallow geology in the survey areas.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:43:34</dc:date>
</oai_dc:dc>
