<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2017, Wessex Archaeology, Blyth Demonstration Site, Inter-tidal Archaeological Watching Brief Method</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_f32bce1c-592a-4c57-a621-7ca67ca72bd9</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Wessex Archaeology has been commissioned by Blyth Offshore Demonstrator Limited (BODL) to produce a Method Statement (MS) in support of archaeological mitigation required for the inter-tidal works that will be completed during the installation of the export cable for Array 2 of the Blyth Offshore Demonstrator Project.

This Method Statement has been prepared by Wessex Archaeology on behalf of BODL in support of its objective to prevent significant impacts to archaeological receptors within the Archaeological Study Area (ASA) during the forthcoming installation of cables within the inter-tidal zone on Cambois Beach (anticipated to commence in 2017). The ASA is made up of the cable route corridor and the onshore works with a 50m buffer around them.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:30:27</dc:date>
</oai_dc:dc>
