<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2010, Royal Haskoning, Kentish Flats Extension, Environmental Scoping Study</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_f821e546-64fd-4b40-b3e9-2f57612ab7a6</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">This scoping report presents an initial review of the potential environmental issues
associated with the construction, operation and eventual decommissioning of the
Kentish Flats Extension, through a targeted scoping study.
Vattenfall believes that an EIA for the Kentish Flats Extension must be adaptive and
should take into account the lessons learnt on those Round 1 and 2 offshore wind farm
projects that have gone through the consenting and construction processes already. As
such, following early consultation with the statutory consultees, Vattenfall is submitting
this scoping report as a formal request for a &#x2018;scoping opinion&#x2019; (see Sections 1.6 and
1.7).
This scoping report aims to identify the key issues for the Kentish Flats Extension
project and sets out the proposed approach to addressing those issues through the EIA
process and in developing the final ES in support of the application for consent.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20101101</dc:date>
</oai_dc:dc>
