<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2012, RPS, Hornsea Project One - Heron Wind and Njord Ventus, Intertidal Walkover Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_fa708d43-d74d-42c3-a847-b110019b4fef</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">An archaeological evaluation comprising a walkover survey was undertaken in the intertidal zone adjoining Horseshoe Point, near North Cotes in East Lindsey, Lincolnshire. The survey area covered an area 500 m to either side of the route of the proposed Hornsea Wind Farm Project One onshore cable. The purpose of this survey was to inform the planning process associated with the construction of an overland cable route from an offshore wind farm at Hornsea, East Yorkshire to a new HVDC converter/HVAC substation adjoining the existing power station at North Killingholme, North Lincolnshire. The survey resutls are presented in a series of datasets and reports.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20210517T13:41:48</dc:date>
</oai_dc:dc>
