  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2015, MMT, Wave Hub (Hayle), Cable Protection Area Rock Bag Installation Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_ffb19c71-f9e2-414b-a85e-d0336d245cef</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Mojo Maritime installed cable protection on the Wave Hub 33KV export cable off the coast of North Cornwall. Stril Explorer was used as platform to accurately place rock filled fibre mesh bags, control their position with ROV and perform a post installation hull-mounted MBES survey.
The ROV fix positions were monitored and approved on board the vessel by the client representative. The post rock bag installation survey provided good quality high resolution bathymetry over the cable protection area and rock bag installation.
To cover the surveyed area, a site chart with horizontal scale of 1:250 has been produced. The site chart presents the bathymetry with colour coded background representing depth, together with the fix positions logged with the ROV.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20241203T16:31:04 20150420T00:00:00</dc:date>