<?xml version="1.0"?>
<oai_dc:dc xmlns:oai_dc="http://www.openarchives.org/OAI/2.0/oai_dc/" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:schemaLocation="http://www.openarchives.org/OAI/2.0/oai_dc/ http://www.openarchives.org/OAI/2.0/oai_dc.xsd">
  <dc:title xmlns:dc="http://purl.org/dc/elements/1.1/">2017, Bibby HydroMap, West of Duddon Sands OFTO, Survey 2a - Consent Survey</dc:title>
  <dc:type xmlns:dc="http://purl.org/dc/elements/1.1/">series</dc:type>
  <dc:identifier xmlns:dc="http://purl.org/dc/elements/1.1/">https://portal.medin.org.uk/portal/start.php?tpc=015_fffba231-d6bb-4334-9b6b-a29bf5ae6976</dc:identifier>
  <dc:description xmlns:dc="http://purl.org/dc/elements/1.1/">Bibby HydroMap were commissioned in April 2017 by DONG Energy to carry out a bathymetric survey on the West of Duddon Sands Offshore Windfarm (WDS01) and the Walney 1 and Walney 2 Offshore Windfarms in the East Irish Sea. This project was undertaken in 4 separate parts comprising: Survey 1 &#x2013; Crossing and Proximity Agreement Survey (CPA) for WDS01; Survey 2a &#x2013; Consent survey at WDS01 covering a selection of 6 turbines, associated array cables, the offshore sub-station (OS) and export routes; Survey 2b &#x2013; CPA for several crossings at WDS01; and Survey 3 &#x2013; An Asset Integrity Survey (AIS) undertaken at Walney 1 and 2 offshore windfarms (WOW01 and WOW02).
This series details the results of the survey of the export cable.</dc:description>
  <dc:date xmlns:dc="http://purl.org/dc/elements/1.1/">20240902T16:15:17</dc:date>
</oai_dc:dc>
