2015, EGS, Lincs Offshore Wind Farm, LS28 Turbine Clearance Survey
series
https://portal.medin.org.uk/portal/start.php?tpc=015_3e162ef2-0644-44dc-8079-3ea3f888e7ac
EGS (International) Ltd, on behalf of Centrica, undertook a Side-Scan Sonar (SSS) and
Multibeam (MBES) clearance survey centered on the no cable zones (500m by 500m) around
WTGs LS28 (on the Lincs site), and ID16 and ID24 (on the Inner Dowsing Site). The areas
surveyed were identified by Centrica for the upcoming works on the aforementioned turbines
and respond to the need to have a jack-up vessel in the locality to complete the works. This
series details the operations and results of the survey around all turbines. Please note the data provided within this series only covers the Lincs site, whilst the report covers both the Lincs and Inner Dowsing Offshore Wind Farms.