2011, Fugro, Zone 3 Dogger Bank Tranche A, Geotechnical Campaign
series
https://portal.medin.org.uk/portal/start.php?tpc=015_d173fb68fd52417b8c3b7ba0cc83fd5d
At the request of Forewind Limited, Fugro Geotechnics AS acted as a main contractor for a geotechnical site investigation performed within Tranche A of the Dogger Bank Wind Farm site. Fugro GeoConsulting Limited was subcontracted to perform offshore geotechnical site supervision, laboratory testing and geotechnical report.
The field work was performed from the geotechnical drilling vessel M/V Bucentaur from 28 June 2011 to 20 July 2011, in accordance with instructions received from Forewind Limited.
The objective of the site investigation was to investigate the seismic anomalies observed from the ultra high resolution geophysical data collected from the site. The water depth was approximately 21.8 m to 35.4 m corrected to Lowest Astronomical Tide.
A total of 33 boreholes were performed at the proposed site, including pilot boreholes at specified locations tocheck for the presence of shallow gas in the soil and geotechnical boreholes incorporating downhole sampling and in-situ testing..
This project includes the Field Report, the Lab and In-Situ Report and an ESRI ArcGIS shapefile of the locations. This metadata refers to the shapefile.
20120214