2015, EGS, Blyth Offshore Demonstrator Project, Annex I Site Survey
series
https://portal.medin.org.uk/portal/start.php?tpc=015_deebc280-b310-4294-8758-a03eb837dc11
In June 2015, EDF Energy Renewables (EDF) contracted EGS International Ltd (EGSi),
supported by Benthic Solutions Limited (BSL) to undertake a pre-construction geophysical,
bathymetric and Annex I habitat survey within the Blyth Offshore Demonstrator Site.
The objective of the benthic survey was to provide sufficient information to identify any
features of conservation importance, such as Annex I habitats, that may have an impact on
the installation and/or consenting process within the Array 2 area and Export Cable Route area. This series contains the Habitat Assessment Reports.
20130226