{
    "@context": "https://schema.org",
    "@type": "Dataset",
    "@id": "https://portal.medin.org.uk/?details&tpc=015_af2cd5cb-604e-430d-b4ce-1cc64adf5831",
    "identifier": "af2cd5cb-604e-430d-b4ce-1cc64adf5831",
    "url": "https://portal.medin.org.uk/?details&tpc=015_af2cd5cb-604e-430d-b4ce-1cc64adf5831",
    "name": "2011, JPKenny, Zone 1 - Moray Firth, Export Cable Route Concept Engineering",
    "description": "In January 2010, EDP Renov\u00e1veis (EDPR) and SeaEnergy Renewables Limited (SERL) were awarded a Zone Development Agreement by The Crown Estate to develop wind farm sites within the Moray Firth zone, one of the nine zones comprised in Round 3 of the UK offshore wind competitive leases. EDPR and SERL have formed Moray Offshore Renewables Limited (MORL) to develop 1.5GW of offshore wind by 2020 within the zone. The objective of this desk-top study is to develop, evaluate, compare, and rank cable route options from the offshore substation to the onshore connection point at Peterhead, taking into consideration all aspects of routing issues including seabed and ground conditions,\r\nengineering constraints, third party interactions, environmental and physical constraints, and restricted zones. Additional ranking criteria for the routes comprise socio-economic considerations, risk, and through-life cost. Up to four routes will be recommended and ranked, each comprising offshore and onshore corridors, and proposed locations for the landfall and the onshore substations. Work related to Stage 1 of Work Package 7 \u2013 Cable Routing Concept Engineering followed the following objectives:\r\n\u2022 Generation of a comprehensive GIS geo-database and associated constraint maps;\r\n\u2022 Study of the bathymetry and slopes;\r\n\u2022 Appraisal of the proposed landfalls;\r\n\u2022 Development of cable routes options through a comprehensive desk-top route\r\nselection process.\r\nThe objectives of Stage 2 of this desk-top study were to develop indicative cost estimates and to compare the route options in terms of complexity, risks and costs. This report was not updated at the end of Stage 2. Stage 3 had the aim to finalise the preferred concept routes by taking into account any new information arising from the advancement of parallel project activities. This report also discusses cable installation methodologies, construction vessel types, and decommissioning requirements, which are part of Work Package 9.",
    "includedInDataCatalog": {
        "@id": "https://portal.medin.org.uk/portal/json-ld/catalog.jsonld"
    },
    "conditionsOfAccess": [
        "access: There will be no limitations when published on the Marine Data Exchange",
        "use: Data Must be used in accordance to the Marine Data Exchange's Terms of Use: https://www.marinedataexchange.co.uk/content/info/terms-of-use"
    ],
    "temporalCoverage": "2011-03-01/2011-07-31",
    "keywords": [
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/P02/current/MBAN/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/P02/current/",
            "termCode": "MBAN",
            "name": "Bathymetry and Elevation"
        },
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/M04/current/M0402/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/M04/current/",
            "termCode": "M0402",
            "name": "Consenting"
        },
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/M04/current/M0404/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/M04/current/",
            "termCode": "M0404",
            "name": "Pre-Construction engineering"
        },
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/M03/current/M0303/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/M03/current/",
            "termCode": "M0303",
            "name": "Cable Landfall"
        },
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/M03/current/M0309/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/M03/current/",
            "termCode": "M0309",
            "name": "Offshore Cable Corridor"
        },
        {
            "@type": "DefinedTerm",
            "identifier": "http://vocab.nerc.ac.uk/collection/P22/current/17/",
            "inDefinedTermSet": "http://vocab.nerc.ac.uk/collection/P22/current/",
            "termCode": "17",
            "name": "Land use"
        }
    ],
    "spatialCoverage": {
        "@type": "Place",
        "geo": {
            "@type": "GeoShape",
            "box": "58.003955 -3.217783 58.322968 -2.569726"
        },
        "additionalProperty": [
            {
                "@type": "PropertyValue",
                "propertyID": "https://apps.epsg.org/api/v1/GeodeticCoordRefSystem/4326",
                "value": "WGS 84"
            }
        ]
    },
    "author": [
        {
            "@type": "Organization",
            "name": "Moray Offshore Renewables Ltd",
            "description": "owner",
            "email": "info@morayoffshorerenewables.co.uk",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "maintainer": [
        {
            "@type": "Organization",
            "name": "Crown Estate Scotland",
            "description": "custodian",
            "email": "enquiries@crownestatescotland.com",
            "telephone": "+44 (0)131 260 6070",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "producer": [
        {
            "@type": "Organization",
            "name": "Moray Offshore Renewables Ltd",
            "description": "originator",
            "email": "info@morayoffshorerenewables.co.uk",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "publisher": [
        {
            "@type": "Organization",
            "name": "Moray Offshore Renewables Ltd",
            "description": "pointOfContact",
            "email": "info@morayoffshorerenewables.co.uk",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "provider": [
        {
            "@type": "Organization",
            "name": "Crown Estate Scotland",
            "description": "distributor",
            "email": "enquiries@crownestatescotland.com",
            "telephone": "+44 (0)131 260 6070",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "creator": [
        {
            "@type": "Organization",
            "name": "Moray Offshore Renewables Ltd",
            "description": "owner",
            "email": "info@morayoffshorerenewables.co.uk",
            "address": {
                "@type": "PostalAddress"
            }
        }
    ],
    "sdPublisher": {
        "@type": "Organization",
        "url": "https://portal.medin.org.uk/portal/",
        "name": "Marine Environmental Data and Information Network (MEDIN)",
        "description": "The MEDIN portal contains information about 19784 marine datasets from over 600 UK organisations. Metadata are an enduring resource and contact details are publicly available for a long time. \r\n\t\tPlease contact us (enquiries@medin.org.uk) if you find your contact details on the MEDIN portal and do not consent to this. \r\n\t\tYou can now use our GitHub repository to report issues or access related documents. Metadata records are updated daily and were last updated 2026-10-02. Record deletion takes place weekly and the latest occurred 2026-09-27."
    }
}