© OpenStreetMap contributors
This series contains the Greater Gabbard Offshore Wind Farm Environmental Statement and it's corresponding Non Technical Summary document. Greater Gabbard Offshore Winds Ltd is proposing to construct a wind farm in the Outer Thames Estuary and associated infrastructure to facilitate export of power to the electricity transmission system. The proposed development is known as the Greater Gabbard Offshore Wind Farm. This document constitutes the Environmental Statement for the project, and presents the findings of the Environmental Impact Assessment undertaken since early 2004.
SSE Renewables
Other details | ||
Internal code | Internally assigned metadata identifier | 7325 |
Title | The title is used to provide a brief and precise description of the dataset such as 'Date', 'Originating organisation/programme', 'Location' and 'Type of survey'. All acronyms and abbreviations should be reproduced in full. | 2005, Project Management Support Services Ltd., (PMSS Ltd), Greater Gabbard Offshore Wind Farm, Environmental Statement |
File Identifier | The File Identifier is a code, preferably a GUID, that is globally unique and remains with the same metadata record even if the record is edited or transferred between portals or tools. | 9bb742f6b1025de0a4e02a7ec19ee0cd |
Resource Identifier | This is the code assigned by the data owner. | 530 |
Resource type | The resource type will likely be a dataset but could also be a series (collection of datasets with a common specification) or a service. | series |
Start date | This describes the date the resource starts. This may only be the year if month and day are not known | 2023-11-29 |
End date | This describes the date the resource ends. This may only be the year if month and day are not known | 2023-11-29 |
Spatial resolution | This describes the spatial resolution of the dataset or the spatial limitations of the service. | inapplicable |
Frequency of updates | This describes the frequency with which the resource is modified or updated i.e. a monitoring programme that samples once per year has a frequency that is described as 'annually'. | notPlanned |
Abstract | The abstract provides a clear and brief statement of the content of the resource. | This series contains the Greater Gabbard Offshore Wind Farm Environmental Statement and it's corresponding Non Technical Summary document. Greater Gabbard Offshore Winds Ltd is proposing to construct a wind farm in the Outer Thames Estuary and associated infrastructure to facilitate export of power to the electricity transmission system. The proposed development is known as the Greater Gabbard Offshore Wind Farm. This document constitutes the Environmental Statement for the project, and presents the findings of the Environmental Impact Assessment undertaken since early 2004. |
Lineage | Lineage includes the background information, history of the sources of data, data quality statements and methods. | The proposed Greater Gabbard Offshore Wind Farm development comprises the installation, operation and subsequent decommissioning of an offshore wind farm in the Outer Thames Estuary, located approximately 23km (12 nautical miles) at its closest point from the Suffolk Coast. The wind farm comprises two arrays of wind turbines and associated infrastructure adjacent to and partly on two shallow underwater sandbanks known as the Inner Gabbard and The Galloper. The site straddles the UK territorial limit, so that the site lies both inside and outside UK territorial waters. The two wind turbine arrays and associated infrastructure are known as the Greater Gabbard Offshore Wind Farm. |
Additional information | This describes relevant references to the data e.g. reports, articles, websites plus other useful information not captured elsewhere. | Origin: PMSS (Project Management Support Services) Ltd |
Related keywords | ||
Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Agreement for Lease Area |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Consenting | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Navigation | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine archaeology | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Birds | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | fish | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Aggregate extraction | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Benthic Habitat | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine Environmental Data and Information Network | |
Keyword title | MEDIN | |
Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine Environmental Data and Information Network |
Keyword title | MEDIN | |
Geographical coverage | ||
North | The northern-most limit of the data resource in decimal degrees | 51.9829312026 |
East | The eastern-most limit of the data resource in decimal degrees | 2.0098946908007 |
South | The southern-most limit of the data resource in decimal degrees | 51.730523678112 |
West | The western-most limit of the data resource in decimal degrees | 1.8447107824667 |
Responsible organisations | ||
Role | The point of contact is person or organisation with responsibility for the creation and maintenance of the metadata for the resource. | pointOfContact |
Organisation name | SSE Renewables | |
Individual name | Kirstanne McDowall | |
Position name | Community Liaison Manager | |
Phone | 01412247569 | |
Delivery point | SSE Renewables, 1 Waterloo Street, Glasgow, G2 6AY | |
URL | www.sserenewables.com | |
Role | The custodian is the person or organisation that accepts responsibility for the resource and ensures appropriate care and maintenance. If a dataset has been lodged with a Data Archive Centre for maintenance then this organisation is be entered here. | custodian |
Organisation name | SSE Renewables | |
Individual name | Kirstanne McDowall | |
Position name | Community Liaison Manager | |
Phone | 01412247569 | |
Delivery point | SSE Renewables, 1 Waterloo Street, Glasgow, G2 6AY | |
URL | www.sserenewables.com | |
Role | The originator is the person or organisation who created, collected or produced the resource. | originator |
Organisation name | PMSS | |
Phone | 01794 526 560 | |
Delivery point | TUV SUD PMSS, Broadwater House, Broadwater Road, Romsey, Hampshire, SO51 8GT | |
URL | www.pmss.com | |
Resource locators | ||
Locator URL | Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk/details/425/summary |
Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk | |
Dataset constraints | ||
21 Conditions for access and use – Use limitation | Any restrictions imposed on accessing the resource. | no conditions apply |
Available data formats | ||
Data format name | Format in which digital data can be provided for transfer | |
Version info | ||
Date of publication | The publication date of the resource or if previously unpublished the date that the resource was made publicly available via the MEDIN network. | 2005-10-03 |
Date of creation | The date that the resource was created. | 2005-10-03 |
Metadata date | The date when the content of this metadata record was last updated. | 2014-01-23 |
Metadata standard name | The name of the metadata standard used to create this metadata | MEDIN Discovery Metadata Standard |
Metadata standard version | The version of the MEDIN Discovery Metadata Standard used to create the metadata record | Version 2.3.7 |
© OpenStreetMap contributors