© OpenStreetMap contributors
Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Seacore Ltd on behalf of DONG Energy Power UK Limited to perform a geotechnical investigation for the proposed West of Duddon Sands Offshore Windfarm. The site investigation was performed to provide soils information that would assist in the geotechnical investigation associated with the survey. The purpose of this geotechnical site investigation is to provide high quality, fit for purpose, geotechnical data in a timely and cost-effective manner. The geotechnical investigation shall provide sufficient and adequate information about soil strata, strength, and deformation parameters to perform a detailed design of the wind turbine foundations. The foundations may be Mono piles (MP) or Suction Bucket Foundations (SBF) for the wind turbines, whereas a jacket pile structure (JPS) is anticipated for the substations. Phase 1 comprised 163 Piezocone Penetration Tests (PCPT), including extra attempts due to early refusal, at 118 turbine locations, 1 substation locations, and 21 extra locations. Phase 2 comprised 96 PCPTs, including extra attempts due to early refusal, at 86 turbine locations. The programme of in situ testing was performed in two phases. Phase 1 was performed from 29th May to 25th June 2010. Phase 2 was performed from 29th July to 25th August 2010.
DONG Energy Power (UK) Ltd
http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx
Other details | ||
Internal code | Internally assigned metadata identifier | 7444 |
Title | The title is used to provide a brief and precise description of the dataset such as 'Date', 'Originating organisation/programme', 'Location' and 'Type of survey'. All acronyms and abbreviations should be reproduced in full. | 2010, Fugro Alluvial Offshore Ltd., West of Duddon Sands Offshore Wind Farm, Geotechnical Investigation (Contract Part A - Turbine Positions) |
File Identifier | The File Identifier is a code, preferably a GUID, that is globally unique and remains with the same metadata record even if the record is edited or transferred between portals or tools. | ace0a541-f6bb-479e-842e-c969a117c737 |
Resource Identifier | This is the code assigned by the data owner. | WDS |
Resource type | The resource type will likely be a dataset but could also be a series (collection of datasets with a common specification) or a service. | series |
Start date | This describes the date the resource starts. This may only be the year if month and day are not known | 2010-05-29 |
End date | This describes the date the resource ends. This may only be the year if month and day are not known | 2010-08-25 |
Spatial resolution | This describes the spatial resolution of the dataset or the spatial limitations of the service. | inapplicable |
Frequency of updates | This describes the frequency with which the resource is modified or updated i.e. a monitoring programme that samples once per year has a frequency that is described as 'annually'. | notPlanned |
Abstract | The abstract provides a clear and brief statement of the content of the resource. | Fugro Alluvial Offshore Limited (FAOL) was contracted by Fugro Seacore Ltd on behalf of DONG Energy Power UK Limited to perform a geotechnical investigation for the proposed West of Duddon Sands Offshore Windfarm. The site investigation was performed to provide soils information that would assist in the geotechnical investigation associated with the survey. The purpose of this geotechnical site investigation is to provide high quality, fit for purpose, geotechnical data in a timely and cost-effective manner. The geotechnical investigation shall provide sufficient and adequate information about soil strata, strength, and deformation parameters to perform a detailed design of the wind turbine foundations. The foundations may be Mono piles (MP) or Suction Bucket Foundations (SBF) for the wind turbines, whereas a jacket pile structure (JPS) is anticipated for the substations. Phase 1 comprised 163 Piezocone Penetration Tests (PCPT), including extra attempts due to early refusal, at 118 turbine locations, 1 substation locations, and 21 extra locations. Phase 2 comprised 96 PCPTs, including extra attempts due to early refusal, at 86 turbine locations. The programme of in situ testing was performed in two phases. Phase 1 was performed from 29th May to 25th June 2010. Phase 2 was performed from 29th July to 25th August 2010. |
Lineage | Lineage includes the background information, history of the sources of data, data quality statements and methods. | The site investigation was performed to provide soils information that would assist in the geotechnical investigation associated with the survey. The purpose of this geotechnical site investigation is to provide high quality, fit for purpose, geotechnical data in a timely and cost effective manner. The geotechnical investigation shall provide sufficient and adequate information about soil strata, strength and deformation parameters to perform a detailed design of the wind turbine foundations. The foundations may be Mono piles (MP) or Suction Bucket Foundations (SBF) for the wind turbines, whereas a jacket pile structure (JPS) is anticipated for the substations. |
Related keywords | ||
Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Pre-Construction engineering |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Renewable Energy Lease area | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Geotechnics | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Offshore Substation | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Sedimentary structure | |
General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine Environmental Data and Information Network | |
Keyword title | MEDIN | |
Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Marine Environmental Data and Information Network |
Keyword title | MEDIN | |
Geographical coverage | ||
North | The northern-most limit of the data resource in decimal degrees | 54.0303 |
East | The eastern-most limit of the data resource in decimal degrees | -3.38 |
South | The southern-most limit of the data resource in decimal degrees | 53.9442 |
West | The western-most limit of the data resource in decimal degrees | -3.5571 |
Responsible organisations | ||
Role | The point of contact is person or organisation with responsibility for the creation and maintenance of the metadata for the resource. | pointOfContact |
Organisation name | ABP Marine Environmental Research Ltd | |
Phone | 02380711840 | |
Delivery point | Quayside Suite,, Medina Chambers,, Town Quay | |
Postal code | SO14 2AQ | |
City | Southampton | |
Country | United Kingdom | |
URL | http://www.abpmer.co.uk | |
Role | The custodian is the person or organisation that accepts responsibility for the resource and ensures appropriate care and maintenance. If a dataset has been lodged with a Data Archive Centre for maintenance then this organisation is be entered here. | custodian |
Organisation name | DONG Energy Power (UK) Ltd | |
Phone | +44 (0) 20 7811 5200 | |
Fax | +44 (0) 20 7811 5298 | |
Delivery point | 33 Grosvenor Place, Belgravia | |
Postal code | SW1X 7HY | |
City | London | |
Country | United Kingdom | |
URL | http://www.dongenergy.co.uk/Pages/landing.html | |
Role | The originator is the person or organisation who created, collected or produced the resource. | originator |
Organisation name | Fugro Alluvial Offshore Limited | |
Phone | 01493 650484 | |
Delivery point | Morton Peto Rd | |
City | Great Yarmouth | |
Country | United Kingdom | |
Role | The distributor is the person or organisation that distributes the resource. | distributor |
Organisation name | The Crown Estate | |
Phone | +44 020 7851 5000 | |
Delivery point | St James's Market | |
Postal code | SW14 4AH | |
City | London | |
Country | United Kingdom | |
URL | http://www.thecrownestate.co.uk | |
Resource locators | ||
Locator URL | Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk/details/2300/summary |
Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk | |
Dataset constraints | ||
20 Limitations on Public Access - Access constraints | ISO restriction code chosen from ISO 19115-1 Codelist | copyright |
20 Limitations on Public Access – Other constraints | Any restriction on the use of the resource such as the need to agree to certain licence conditions. | http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx |
21 Conditions for Access and Use - Use limitation | Any restrictions imposed on accessing the resource such as the need to agree to certain licence conditions. | http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx |
21 Conditions for access and use – Use limitation | Any restrictions imposed on accessing the resource. | http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx |
Available data formats | ||
Data format name | Format in which digital data can be provided for transfer | .log |
Version info | ||
Date of publication | The publication date of the resource or if previously unpublished the date that the resource was made publicly available via the MEDIN network. | 2010-12-01 |
Metadata date | The date when the content of this metadata record was last updated. | 2017-02-02 |
Metadata standard name | The name of the metadata standard used to create this metadata | MEDIN Discovery Profile |
Metadata standard version | The version of the MEDIN Discovery Metadata Standard used to create the metadata record | 2.3.8 |
© OpenStreetMap contributors