2b081673-05b6-4101-b695-8db43020d6fc
eng
series
The Crown Estate
+44 020 7851 5000
16 New Burlington Place
London
W1S 2HX
United Kingdom
enquiries@thecrownestate.co.uk
http://www.thecrownestate.co.uk
pointOfContact
2015-04-23
MEDIN Discovery Profile
2.3.8
urn:ogc:def:crs:EPSG::4326
2014 - 2015, Fugro, Blyth NaREC Offshore Demonstration Site, Geotechnical Survey
2014-11-28
publication
J11273-R-001
EDF Energy Renewables Ltd (EDF) is currently planning to develop the Blyth Offshore Demonstrator Wind Farm (Blyth site), East of Blyth, UKCS, North Sea. The proposed wind farm is located approximately at a site which ranges from 6.5 km (Array 2) to 17.1 km (Array 4) off the coast from Blyth harbour. Fugro GeoConsulting Limited (Fugro) was requested by EDF to perform a geotechnical site investigation at the site to provide soils information to assist with the proposed development of the Blyth site. The fieldwork was performed in accordance with NORSOK Standard G-001 and instructions received from EDF. The site investigation consisted of cone penetration testing (CPT) and downhole sampling operations and was performed from 4 November to 10 November 2014.
EDF Energy Renewables
info@edf-er.com
edf-er.com
custodian
Fugro EMU Limited
+44 (0) 1489 860050
1 Mill Court
The Sawmills
Durley
Southampton
Hampshire
SO32 2EJ
United Kingdom
marketing@fugroemu.com
http://www.fugroemu.com/
originator
notPlanned
Pre-Construction engineering
The Crown Estate Renewable Energy Development Phases
2012-05-15
revision
1
Agreement for Lease Area
The Crown Estate Renewable Energy Development Areas
2012-05-15
revision
1
Sedimentary structure
Geotechnics
Sediment grain size parameters
water content, porosity and surface area
Carbon concentrations in sediment
Sea level
SeaDataNet Parameter Discovery Vocabulary
2015-04-09
revision
88
Marine Environmental Data and Information Network
Marine Environmental Data and Information Network
http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx
copyright
otherRestrictions
copyright
otherRestrictions
http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx
http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx
eng
environment
geoscientificInformation
-1.53
-1.27
55.10
55.24
2014-11-04
2015-02-11
series
This report and the assessment carried out in connection with the report (together the “Services”) were compiled and carried out by Fugro
GeoConsulting Limited (“Fugro”) for EDF Energy Renewables Ltd (the “Client”) in accordance with the terms of a contract between Fugro
and the Client. The Services were performed by Fugro with the skill and care ordinarily exercised by a reasonable geotechnical specialist at
the time the Services were performed. Further, and in particular, the Services were performed by Fugro taking into account the limits of the
scope of works required by the Client, the time scale involved and the resources, including financial and manpower resources, agreed
between Fugro and the Client.
https://www.marinedataexchange.co.uk/details/77/summary
A link to the web service or dataset.
https://www.marinedataexchange.co.uk
A link to the general host site.