© OpenStreetMap contributors
- Add External Layer
- Upload Shapefile
- Layer Tutorial
- Close
Use the checkbox () to show or hide a layer.
Use the radio buttons () to select a layer to use with the identify function.
- Layers
- Opacity
Available layers
Search for marine data across UK organisations
- API
- How-To
- About
- Contact MEDIN
- Share
Metadata: 2019, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys
Abstract:
Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake two geophysical surveys (in August-September 2018 and April 2019) at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. The 2019 survey was undertaken between 16th and 30th April 2019. This survey, comprising the collection of multibeam bathymetry and side scan sonar data, marks the first of a 3-year monitoring program, which will be undertaken at 6 monthly intervals, and after any major storm events. The objectives of the survey program are to acquire survey data to a resolution that will: - Identify seabed debris within the construction area; - Identify changes to seabed morphology, to enable the evaluation of the effectiveness of installed scour protection and ratify predictions for scour development; - Inform the foundation and cable maintenance schedule; and - Satisfy the requirements of the Marine Licence.
Data holder:
The Crown Estate
| Other details | ||
| Internal code | Internally assigned metadata identifier | 18981 |
| Title | The title is used to provide a brief and precise description of the dataset such as 'Date', 'Originating organisation/programme', 'Location' and 'Type of survey'. All acronyms and abbreviations should be reproduced in full. | 2019, Bibby HydroMap, Blyth Demonstration Site, Operations and Maintenance Geophysical Surveys |
| Alternative title | The purpose of alternative title is to record any additional names by which the dataset may be known. | Operations and Maintenance Geophysical Surveys |
| File Identifier | The File Identifier is a code, preferably a GUID, that is globally unique and remains with the same metadata record even if the record is edited or transferred between portals or tools. | 0db871cc-8c30-4742-9340-f34a7f76c6f0 |
| Resource Identifier | This is the code assigned by the data owner. | TCE-121 |
| Resource type | The resource type will likely be a dataset but could also be a series (collection of datasets with a common specification) or a service. | series |
| Start date | This describes the date the resource starts. This may only be the year if month and day are not known | 2019-04-16 |
| End date | This describes the date the resource ends. This may only be the year if month and day are not known | 2019-04-30 |
| Frequency of updates | This describes the frequency with which the resource is modified or updated i.e. a monitoring programme that samples once per year has a frequency that is described as 'annually'. | notPlanned |
| Abstract | The abstract provides a clear and brief statement of the content of the resource. | Bibby HydroMap were commissioned by Blyth Offshore Demonstrator Ltd/EDF Renewables, in August 2018, to undertake two geophysical surveys (in August-September 2018 and April 2019) at the Blyth Offshore Demonstrator wind farm, located off the north-east coast of the UK at Blyth, Northumberland. The 2019 survey was undertaken between 16th and 30th April 2019. This survey, comprising the collection of multibeam bathymetry and side scan sonar data, marks the first of a 3-year monitoring program, which will be undertaken at 6 monthly intervals, and after any major storm events. The objectives of the survey program are to acquire survey data to a resolution that will: - Identify seabed debris within the construction area; - Identify changes to seabed morphology, to enable the evaluation of the effectiveness of installed scour protection and ratify predictions for scour development; - Inform the foundation and cable maintenance schedule; and - Satisfy the requirements of the Marine Licence. |
| Lineage | Lineage includes the background information, history of the sources of data, data quality statements and methods. | A RESON T20-P dual head multibeam echo sounder was used to collect bathymetry data within the survey area. Within the transducer mounting a Sound Velocity (SV) sensor was fitted to provide realtime SV values. The system was interfaced with the Applanix PosMV system to provide timing and motion data to the collected bathymetry data. The MBES and peripheral sensors were interfaced to QPS QINSy, which stored and visualised the data during acquisition. The Simrad EA400 Single beam echo sounder was utilised as a quality check on the absolute values of the MBES data. This data was also interfaced to QPS QINSy, which recorded and visualised the data. The multibeam system performed as expected during acquisition, providing generally high-quality data collection throughout the survey area. Data was continually monitored during acquisition by the online surveyor to ensure project specific and Bibby HydroMaps data standards were achieved. The sound velocity profile of the water column was continually monitored during the survey, with profiles collected at least every 6 hours and as the water depth changes dictated. The profiles indicated minor variation during the survey, fluctuating between 1497 ms-1 and 1502ms-1. The recorded sound velocity information within the survey area indicates this variable had negligible influence in the total propagated uncertainty (TPU) of the multibeam soundings. An Edgetech 4200MP dual frequency digital high-resolution side scan sonar system was utilised for the SSS aspect of the works. The system comprises a digital tow fish and a transceiver processor unit (TPU) interfaced to a CODA DA4G geophysical data acquisition system running Coda GeoSurvey acquisition software. Coda GeoSurvey software records dual frequency raw data simultaneously, which is time-stamped, and combined with positional information from QPS QINSy navigation software, providing real time geo-referencing of the records. The sonar data is displayed in real-time and gains are applied to the raw data for preliminary interpretation of the seabed acoustic properties and for the investigation of any potential target present on the seabed or on the water column, along with the capability for target tagging and accurate measurement and image capture tools. Tow fish positioning was carried out using the USBL system onboard which calculated a range and bearing to a beacon installed on the tow cable (1m from the tow fish) relative to a known vessel offset. As a backup, the length of cable out was measured using a T-Count system. The side scan sonar data collected was, generally, of high quality. Over 125% coverage was achieved allowing targets to be identified on more than one survey line and the centres of each swath to be covered. Side scan sonar line spacing was 50, 40, and 25 metres, with an operating range of 75 metres being utilised. The fish was towed at an optimum height (for the range of 75 metres) of approximately 8 or 4 metres above the seabed. Occasional tugging was evident although this has not affected the quality of the final mosaic or the identification of any targets, features, or seabed character and all lines re-run if the data quality was sub-standard. Similarly, positional data was of high quality, enabling accurate location of any targets, and ensuring seabed features aligned on adjacent lines. |
| Related keywords | ||
| Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Sedimentary structure |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Side-scan sonar | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Bathymetry and Elevation | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Post-Construction monitoring | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Renewable Energy Lease area | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Elevation | |
| Geographical coverage | ||
| North | The northern-most limit of the data resource in decimal degrees | 55.24 |
| East | The eastern-most limit of the data resource in decimal degrees | -1.27 |
| South | The southern-most limit of the data resource in decimal degrees | 55.1 |
| West | The western-most limit of the data resource in decimal degrees | -1.53 |
| Responsible organisations | ||
| Role | The point of contact is person or organisation with responsibility for the creation and maintenance of the metadata for the resource. | pointOfContact |
| Organisation name | ABP Marine Environmental Research Ltd | |
| Phone | 02380711840 | |
| enquiries@abpmer.co.uk | ||
| Role | The custodian is the person or organisation that accepts responsibility for the resource and ensures appropriate care and maintenance. If a dataset has been lodged with a Data Archive Centre for maintenance then this organisation is be entered here. | custodian |
| Organisation name | The Crown Estate | |
| Phone | +44 020 7851 5000 | |
| enquiries@thecrownestate.co.uk | ||
| Role | The originator is the person or organisation who created, collected or produced the resource. | originator |
| Organisation name | Bibby HydroMap | |
| Phone | +44 1513 281 120 | |
| enquiries@bibbyhydromap.com | ||
| Role | The distributor is the person or organisation that distributes the resource. | distributor |
| Organisation name | The Crown Estate | |
| Phone | +44 020 7851 5000 | |
| enquiries@thecrownestate.co.uk | ||
| Role | The owner is the person or organisation that owns the resource. | owner |
| Organisation name | The Crown Estate | |
| Phone | +44 020 7851 5000 | |
| enquiries@thecrownestate.co.uk | ||
| Resource locators | ||
| Locator URL | Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk/details/TCE-121/summary |
| Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk | |
| Dataset constraints | ||
| 20.1 Limitations on Public Access - Access constraints | This states `otherRestrictions` from ISO vocabulary RestrictionCode and is an INSPIRE/GEMINI requirement. | otherRestrictions |
| 20.2 Limitations on Public Access - Other constraints | http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx | |
| 21.1 Conditions for Access and Use - Use constraints | This states `otherRestrictions` from ISO vocabulary RestrictionCode and is an INSPIRE/GEMINI requirement. | otherRestrictions |
| 21.2 Conditions for Access and Use - Other constraints | This states any constraints on use of the data. Multiple conditions can be recorded for different parts of the data resource. If no conditions apply, then `No condtions apply` is recorded. This uses free text. | http://www.marinedataexchange.co.uk/pages/terms-of-use.aspx |
| Version info | ||
| Date of publication | The publication date of the resource or if previously unpublished the date that the resource was made publicly available via the MEDIN network. | 2021-11-10 |
| Harvest date | The date which this record has been (re)harvested from the provider. | 2026-04-12 |
| Metadata date | The date when the content of this metadata record was last updated. | 2026-02-13 |
| Metadata standard name | The name of the metadata standard used to create this metadata | MEDIN |
| Metadata standard version | The version of the MEDIN Discovery Metadata Standard used to create the metadata record | 3.1.2 |