© OpenStreetMap contributors
- Add External Layer
- Upload Shapefile
- Layer Tutorial
- Close
Use the checkbox () to show or hide a layer.
Use the radio buttons () to select a layer to use with the identify function.
- Layers
- Opacity
Available layers
Search for marine data across UK organisations
- API
- How-To
- How-To
- About
- Contact MEDIN
- Share
Metadata: 2011, Cathie Associates, Zone 1 - Moray Firth, Geotechnical Ground Model
Abstract:
Moray Offshore Renewables Ltd (MORL) is developing the UK Round 3 Moray Offshore wind farm located within the Moray Firth off the east coast of Scotland. The wind farm has been divided into two development phases: phase 1 (Eastern development area) and Phase 2 (Western development area). A geophysical survey was carried out by Osiris Projects between May and September 2010 covering both the Phase 1 and Phase 2 development areas. The geophysical survey was utilised in the development of a geotechnical borehole location rational based on the identification of preliminary lithological boundaries, as presented in Senergy’s Preliminary Site Evaluation report. As part of the development process MORL commissioned a reconnaissance geotechnical survey for the Phase 1 area. The geotechnical survey was undertaken between 2nd November and the 14th December 2010 by Fugro GeoConsulting Limited under the supervision of Cathie Associates. The survey comprised the advance of twenty five exploratory geotechnical boreholes across the Phase 1 area including six re-drills. Samples recovered as part of the survey were tested in the Fugro Geotechnical laboratory (Wallingford) in order to undertake a geotechnical appraisal of materials encountered beneath the Phase 1 area of the wind farm development site. A summary of all geotechnical laboratory test results was issued in Fugro‘s Laboratory and In-situ Data report.
Data holder:
Crown Estate Scotland
| Other details | ||
| Internal code | Internally assigned metadata identifier | 19584 |
| Title | The title is used to provide a brief and precise description of the dataset such as 'Date', 'Originating organisation/programme', 'Location' and 'Type of survey'. All acronyms and abbreviations should be reproduced in full. | 2011, Cathie Associates, Zone 1 - Moray Firth, Geotechnical Ground Model |
| File Identifier | The File Identifier is a code, preferably a GUID, that is globally unique and remains with the same metadata record even if the record is edited or transferred between portals or tools. | dddefa2f-595b-4fde-8a79-e4fc6dd11534 |
| Resource Identifier | This is the code assigned by the data owner. | CES-375 |
| Resource type | The resource type will likely be a dataset but could also be a series (collection of datasets with a common specification) or a service. | series |
| Start date | This describes the date the resource starts. This may only be the year if month and day are not known | 2010-11-02 |
| End date | This describes the date the resource ends. This may only be the year if month and day are not known | 2010-12-14 |
| Frequency of updates | This describes the frequency with which the resource is modified or updated i.e. a monitoring programme that samples once per year has a frequency that is described as 'annually'. | notPlanned |
| Abstract | The abstract provides a clear and brief statement of the content of the resource. | Moray Offshore Renewables Ltd (MORL) is developing the UK Round 3 Moray Offshore wind farm located within the Moray Firth off the east coast of Scotland. The wind farm has been divided into two development phases: phase 1 (Eastern development area) and Phase 2 (Western development area). A geophysical survey was carried out by Osiris Projects between May and September 2010 covering both the Phase 1 and Phase 2 development areas. The geophysical survey was utilised in the development of a geotechnical borehole location rational based on the identification of preliminary lithological boundaries, as presented in Senergy’s Preliminary Site Evaluation report. As part of the development process MORL commissioned a reconnaissance geotechnical survey for the Phase 1 area. The geotechnical survey was undertaken between 2nd November and the 14th December 2010 by Fugro GeoConsulting Limited under the supervision of Cathie Associates. The survey comprised the advance of twenty five exploratory geotechnical boreholes across the Phase 1 area including six re-drills. Samples recovered as part of the survey were tested in the Fugro Geotechnical laboratory (Wallingford) in order to undertake a geotechnical appraisal of materials encountered beneath the Phase 1 area of the wind farm development site. A summary of all geotechnical laboratory test results was issued in Fugro‘s Laboratory and In-situ Data report. |
| Lineage | Lineage includes the background information, history of the sources of data, data quality statements and methods. | Moray Offshore Renewables Ltd (MORL) is developing the UK Round 3 Moray Offshore wind farm located within the Moray Firth off the east coast of Scotland. The wind farm has been divided into two development phases: Phase1 Eastern Development Area Phase2 Western Development Area A geophysical survey was carried out by Osiris Projects between May and September 2010 covering both the Phase 1 and Phase 2 development areas. The geophysical survey was utilised in the development of a geotechnical borehole location rational based on the identification of preliminary lithological boundaries, as presented in Senergy?s Preliminary Site Evaluation report. As part of the development process MORL commissioned a reconnaissance geotechnical survey for the Phase 1 area to achieve the following aims: to mitigate against potential geological and geotechnical risk; to provide geotechnical parameters for detailed foundation design for the met mast to enable conceptual/FEED level engineering analysis To verify and/or allow re-interpretation of the geophysical survey The geotechnical survey was undertaken between 2nd November and the 14th December 2010 by Fugro GeoConsulting Limited under the supervision of Cathie Associates. The survey comprised the advance of twenty five exploratory geotechnical boreholes across the Phase 1 area including six re-drills. Samples recovered as part of the survey were tested in the Fugro Geotechnical laboratory (Wallingford) in order to undertake a geotechnical appraisal of materials encountered beneath the Phase 1 area of the wind farm development site. A summary of all geotechnical laboratory test results was issued in Fugro?s Laboratory and In-situ Data report. |
| Related keywords | ||
| Keyword | General subject area(s) associated with the resource, uses multiple controlled vocabularies | Sediment grain size parameters |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Consenting | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Pre-Construction engineering | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Offshore area of search | |
| General subject area(s) associated with the resource, uses multiple controlled vocabularies | Geology | |
| Geographical coverage | ||
| North | The northern-most limit of the data resource in decimal degrees | 58.287207 |
| East | The eastern-most limit of the data resource in decimal degrees | -2.578843 |
| South | The southern-most limit of the data resource in decimal degrees | 58.077882 |
| West | The western-most limit of the data resource in decimal degrees | -2.888148 |
| Responsible organisations | ||
| Role | The point of contact is person or organisation with responsibility for the creation and maintenance of the metadata for the resource. | pointOfContact |
| Organisation name | EDP Renewables | |
| Individual name | Rebecca Hughes | |
| Position name | GIS & Data Manager | |
| Phone | 0131 556 7602 | |
| rebecca.hughes@edpr.com | ||
| Role | The custodian is the person or organisation that accepts responsibility for the resource and ensures appropriate care and maintenance. If a dataset has been lodged with a Data Archive Centre for maintenance then this organisation is be entered here. | custodian |
| Organisation name | Crown Estate Scotland | |
| Phone | +44 (0)131 260 6070 | |
| enquiries@crownestatescotland.com | ||
| Role | The originator is the person or organisation who created, collected or produced the resource. | originator |
| Organisation name | Cathie Associates Ltd | |
| Individual name | Cath Beech | |
| Phone | 0191 269 6920 | |
| info@cathieaccociates.com | ||
| Role | The distributor is the person or organisation that distributes the resource. | distributor |
| Organisation name | Crown Estate Scotland | |
| Phone | +44 (0)131 260 6070 | |
| enquiries@crownestatescotland.com | ||
| Role | The owner is the person or organisation that owns the resource. | owner |
| Organisation name | EDP Renewables | |
| rebecca.hughes@edpr.com | ||
| Resource locators | ||
| Locator URL | Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk/details/CES-375/summary |
| Web address (URL) that links to the resource | https://www.marinedataexchange.co.uk | |
| Dataset constraints | ||
| 20.1 Limitations on Public Access - Access constraints | This states `otherRestrictions` from ISO vocabulary RestrictionCode and is an INSPIRE/GEMINI requirement. | otherRestrictions |
| 20.2 Limitations on Public Access - Other constraints | There will be no limitations when published on the Marine Data Exchange | |
| 21.1 Conditions for Access and Use - Use constraints | This states `otherRestrictions` from ISO vocabulary RestrictionCode and is an INSPIRE/GEMINI requirement. | otherRestrictions |
| 21.2 Conditions for Access and Use - Other constraints | This states any constraints on use of the data. Multiple conditions can be recorded for different parts of the data resource. If no conditions apply, then `No condtions apply` is recorded. This uses free text. | Data Must be used in accordance to the Marine Data Exchange's Terms of Use: https://www.marinedataexchange.co.uk/content/info/terms-of-use |
| Version info | ||
| Date of publication | The publication date of the resource or if previously unpublished the date that the resource was made publicly available via the MEDIN network. | 2026-09-08 |
| Harvest date | The date which this record has been (re)harvested from the provider. | 2026-09-27 |
| Metadata date | The date when the content of this metadata record was last updated. | 2026-09-08 |
| Metadata standard name | The name of the metadata standard used to create this metadata | MEDIN |
| Metadata standard version | The version of the MEDIN Discovery Metadata Standard used to create the metadata record | 3.1.2 |